Vitamin B12

The west bedroom floor finish is mostly dry and should be “walkable” tomorrow afternoon. Scratch sanding the previous coats and cleaning up all the dust took most of Saturday. I vaccuumed the whole room twice, include walls. Then wiped it all down with tackcloth (including the entire ceiling). At least for a few days, it will be the most dust free room at 118 Henry Street.

Today, besides applying the floor finish upstairs, I worked on replacing the mudroom door threshold. It’s never been quite right even after a couple of tries at improving it. Pictures to come later.

Meanwhile, here are a couple of oldies but goodies of the mudroom makeover, April 2004:

(Warning: looong load times)

First, a slideshow of the interior work.

Second, a slideshow of the exterior work.